Showing posts with label Vincennes Clark Middle School. Show all posts
Showing posts with label Vincennes Clark Middle School. Show all posts

Wednesday, March 23, 2011

March 2011

project of the month
Clark Middle School, Vincennes Community School Corporation
Clark Middle School - main entry

Clark Middle School - Gymnasium

Clark Middle School - Media Center
The new Clark Middle School in Vincennes, Indiana replaced their existing 80 year old facility.  The new school is located on the same campus as the Vincennes High School, helping the school system minimize transportation costs. The new facility is a state-of-the-art, 148,560 square feet building designed to provide a healthy environment for the students.


Low emitting materials and a two-week pre-occupation building flush-out period were utilized to promote the healthy air of the facility.  The school also utilized staggered stud construction and acoustical insulation throughout to provide quiet core learning spaces with a decibel level no higher than 45.


All of this, and an energy-efficient mechanical system, contributed to this school being the first school in Indiana to be certified under the LEED for Schools rating system, and it achieved the Silver level. 


What a great way to start a new school facility.


news
Update on 2030 goals
During this month's staff advance, the Sustainability Committee presented an update on Schmidt Associates' progress  towards meeting the 2030 Commitment. Below is a brief summary of the progress (items in white are yet to be completed):

  • Establish a team to guide the firm's 2030 plan. Implement a minimum of 4 operational action items from list provided
  • Develop a sustainability action plan.

Design Philosophy and Project Verification Goals

  • Update BIM Execution Plan
  • Life Cycle Cost Analysis
  • Develop Sustainability Case Studies
  • Develop Office Standards for Building Envelope
  • Develop Office Standards for Orientation and Window Systems

Staff Training/Education

  • Conversion of staff to LEED AP+ (to occur in May)LEED Boot Camp 2010
  • Include Sustainability training in orientation process
  • Include 2030 Training classes in Schmidt Academy
  • Become a USGBC certified education provider

Operations

  • Upgrade exterior windows on Wil-Fra-Mar building
  • Upgrade Mechanical Units
  • Develop Sustainability policy
  • Develop Sustainable printing policy
  • Create a relevant Intranet Site
  • Have facility become LEED EB certifiedBecome carbon neutral

Business Strategy/Marketing

  • Develop marketing brochure
  • Develop Owner training

Also as part of the 2030 Commitment, the firm reported on all of the applicable projects that were in a Design phase during 2010. The charts below indicate how Schmidt Associates scored towards meeting these goals. The goal of the 2030 Challenge is to reduce projects' energy consumption incrementally so that by the year 2030 all projects are carbon neutral. The goal for 2010 is to be 60% more efficient in energy use.  This is the first year this information has been tracked and should not be viewed as a failure of reaching the goals established, but merely as a benchmark for improvement.  If you have any questions please drop Stan a line.





events
  • 2011 Indianapolis Sustainability Awards: March 24 - SustainIndy.org (5 IPS schools renovated to meet LEED criteria are nominated for Energy category - Schmidt Associates is the Program Manager for all IPS projects)
  • Plant swap - this spring
  • Carpool to work Day - coming soon
opinion
The Sustainability Committee has made a concerted effort to conduct High Performance Scorecard reviews of projects earlier in the design process. The intent of these reviews is to identify opportunities for a project to incorporate sustainable design ideas.  By doing these reviews earlier, when a project is just being defined, it helps get everyone in the right mindset and makes it less difficult to incorporate.


Often sustainable design is viewed as an extra effort for a project. It comes with a stigma of increasing cost and requiring research. This is a misconception. It is important to see the whole picture of the facilities we design. The emphasis on the construction cost is somewhat misplaced. The life cycle costs need to be taken into consideration when making decisions during design. Sustainability should be more about taking out of the project instead of adding to it. Our goal should be to reduce the amount of energy that a building is consuming thus reducing operational expenses.  It is important for us to know the payback periods of systems we are providing versus an "easier" more economical system.  


An example of this would be LED lighting versus T8 fluorescent lighting. Both are efficient lighting types. The LED option uses far less energy though and does not require to be replaced as often. The initial cost difference may not be able to be overcome for 10 years, but if the facility is being designed to last for 50 years this could be a wise investment. It all would go back to the goals of the project and how to achieve those goals.  


Our role isn't to make sure sustainable design is incorporated into every project, it is to make sure we are investigating all the options and presenting the whole picture to the Owner.  Sometimes it is challenging, but that is what sets apart the good designers, and I am proud to say Schmidt Associates is full of good designers.


See you next month,
Sustainable Stan




Friday, June 18, 2010

June 2010

project of the month
Clark Middle School
Vincennes Community School Corporation




The New Clark Middle School in Vincennes, Indiana will be dedicated June 24 at 6:00 pm. This all-new Middle School will be the first LEED for Schools certified building in the state of Indiana. LEED for Schools is slightly different than LEED for new construction. LEED for Schools adds requirements and offers credits for the following items:


  • SSp2 - Environmental Site Assessment: Conducting a Phase 1 Environmental Assessment whether your site is on a brownfield or not.
  • SSc9 - Site Master Plan: This credit addresses future expansion (reducing potential demolition and disturbance to the site)
  • SSc10 - Joint Use of Facilities: Offers credit for allowing the school to house public service activities.
  • WEc4 - Process Water Use Reduction: Process water is water used in equipment (i.e. cooling towers, dishwashers). Reducing water used for these machines can earn a credit.
  • EQp3 - Minimum Acoustical Performance: The building is required to meet prescribed STC ratings. 
  • EQc9 - Enhanced Acoustical Performance: By achieving further acoustical isolation, credit are given.
  • EQc10 - Mold Prevention: This addresses maintaining a relative humidity percentage within the building.
  • IDc3 - School as a Teaching Tool: Develop a curriculum that incorporates sustainable design and using the school to demonstrate principles.
Clark Middle School will be an exciting example for the Vincennes community of how sustainable design can affect the teaching environment. Schmidt Associates is proud to have been associated with this project and appreciates the opportunity to influence today's youth through sustainable design.


news


June 2010 - Sustainable Stan Award Winner
Congratulations to Steve Sturm, Schmidt Associates' Project Information Administrator. Steve has consistently used alternative means of transportation to get to work every day - his bicycle. Steve's commute takes him about 1 hour by bike.  Biking to work reduces our carbon footprints and use of fossil fuels. According to a 2001 transportation survey, 2,287 billion vehicle miles were spent which equals $150.3 billion on fuel.
Last month's bike-to-work day should have encouraged other Schmidt employees to join Steve's ritual, however the weather did not cooperate. But, the weather did not deter Steve from riding. He was the only person on staff to ride in. His exemplary behavior is well deserved for this month's Sustainable Stan Award.

2030 Update
The Sustainability Committee has been working hard on several initiatives for the 2030 Challenge. They will present their progress at the next Schmidt Associates staff advance. We will also keep you up to date on the progress here in the Sustainable Stan Journal.  


LEED Bootcamp
The LEED Bootcamp has been completed. Schmidt Associates had 23 participants go through the sessions to prepare them for taking the LEED-AP BD+C exam.  As you may be aware, the current LEED-AP exam consists of 2 parts now; a LEED-GA portion (Green Associates) and a LEED BD+C portion. Taking just the GA portion alone is an option as well. Before the camp was completed, we already had one participant (Seth Mathis) pass the GA exam.  We're looking forward to having more Bootcamp graduates pass the test here in the next few months. Stan wishes you all luck.

Contact Stan
Sustainable Stan now has an official email address:sustainable@schmidt-arch.com. If you have anything you would like to share with Stan feel free to drop him a line.  

events
We do not have dates set for some of our summer sustainability events yet, but we will keep you posted. We look forward to seeing you there:
Random Acts of Greenness - Riley Area cleanup
Carpool to Work/Mass Transit Day
Thermal Comfort/Fresh Air Day
Re-tie-rement Party (swap)
opinion
Stan is very encouraged by the sustainable awareness along Mass Ave. The Athenaeum recently installed a rain garden next to its front door. The Sustainability Committee's own Craig Flandermeyer donated his time to design the area and consult during construction efforts. The rain garden will help reduce the stormwater quantity and help filter it prior to the city storm system. With Indianapolis's antiquated combined sewer system, every reduction in storm water is a benefit.  Enhancing the pedestrian experience of this historic facility was also a goal of the project.  Benches give patrons flexibility to view the rain garden or observe street activity. The birds and butterflies of the avenue will also enjoy the biodiversity of plants now available versus what was previously a monoculture lawn as a space to hang out.  Be sure to check out this project (and its future Greg Nichols designed educational sign) on the way for your next Optimator (Beer - magnifico).